Table 6.

Field operation. Soil residues of picloram after application of 1% Tordon 101 with a hydraulic spray truck. Data in ppm are the means of two layers. Each composite sample consisted of 5 cores representing an area of 9 sq. ft. Targets A and B were 20 feet apart.

Layer in7/26/838/2/838/10/838/17/838/24/839/29/83
ABABABABABAB
00-100.040.040.110.150.110.130.030.090.030.160.080.08
10-20N.D.N.D.0.02N.D.0.010.010.030.05
20-300.010.05