Table 3.
Annual heating and cooling costs for the three unshaded prototypes
Construction Type
Heating
$
Cooling
$
Total
$
Masonry 80
88 (15%)
505 (85)%
593
Wood 80
68 (13%)
449 (87%)
517
Masonry 50
273 (20%)
1,120 (80%)
1,393