Table 1.

Baltimore Gas and Electric Company Breakdown Analysis. Greening of Dundalk Project.

Embedded Image
Year 1$10,940$ 5,480
Year 211,815
Year 312,76012,204*
Year 413,781
Year 514,88320,301
Year 616,074
Year 717,360
  • * Break-even point in between 3 to 3.3 years for this study.

  • Stump removal and planting was accomplished by volunteer and municipal crews. Consequently, total removal cost was reduced, thereby lowering the break-even point from past removal and planting studies at BG&E where these costs were included. The break-even point was six years.