Baltimore Gas and Electric Company Breakdown Analysis. Greening of Dundalk Project.
![]() | ||
Year 1 | $10,940 | $ 5,480 |
Year 2 | 11,815 | |
Year 3 | 12,760 | 12,204* |
Year 4 | 13,781 | |
Year 5 | 14,883 | 20,301 |
Year 6 | 16,074 | |
Year 7 | 17,360 |
↵* Break-even point in between 3 to 3.3 years for this study.
Stump removal and planting was accomplished by volunteer and municipal crews. Consequently, total removal cost was reduced, thereby lowering the break-even point from past removal and planting studies at BG&E where these costs were included. The break-even point was six years.