Abstract
In 1971, the Manager of Public Service Company of Colorado ordered an evaluation of all line clearing contractors that were under contract to the Company to determine which contractor was doing the best job for the Company. Various reports, forms, guidelines and procedures were developed to accomplish this task. Within reasonable limitations, it is now possible to grade the various line clearing contractors and individual crews with a degree of confidence.
Purpose
The purpose of a crew evaluation is to evaluate the line clearing program to determine the contractors and individual crews that are operating most effectively and economically and also to present reliable data and sound recommendations to Management for appropriate action. To make sound and fair decisions, Management requires dependable data. General information and personal opinion cannot be relied upon alone to make important decisions, such as terminating contractor X’s agreement and giving his crews to contractor Y.
Audits, Forms and Procedures
General information, such as 20 trees trimmed on July 18 on Main Street between 2nd and 44th Avenue, is sufficient to process a contractor’s invoice, but this same information is not enough detail to make a field evaluation and audit of the work. The information must be accurate and detailed enough for the utility representative to locate the exact trees that were trimmed on July 18. As an example, 2 trees trimmed at 1804 Main Street, 6 trees trimmed at 2036 Main Street, and so on. A form, the Weekly Tree Work Audit, was developed for recording this information (see Appendix). The cost per tree is meaningless if the crew leader records inaccurate and inflated work progress figures.
Standard appraisal forms were developed to record the crew’s dependability, public relations, quality and qualtity of work and other specific problems (see Apopendix).
Public Service Company of Colorado’s first formal evaluation of their line clearing contracts was in June 1971. This evaluation pointed out the fact that the Company had as many rough spots to smooth out as the contractors. As an example, service dispatchers, general line foremen, and anyone driving a Company vehicle were all coordinating the tree crew's work, resulting in considerable latitude in methods used and results achieved. Field operations demonstrated a need for higher level planning and coordination. In the words of one superintendent, “We rely upon the expertise and dedication of our line clearing contractor to supply us with an effective and economical line clearing program.” His faith was misplaced.
The evaluation indicated that a few of the contractor’s weak spots included supervision, which varied from average to none at all. Crews were traveling too many miles from the headquarters location to the work location. The headquarters location should be moved closer to the job. In addition, crews were traveling too many miles from one job to another on special assignments, which means lower production unless carefully scheduled. The tree removal program varied from fair to none at all with some crews. The method of line clearing varied from crew to crew and included stubbing, round over and very little drop crotch trimming.
At the time of the first evaluation, the Company did not have written standards or guidelines for the line clearing program. Because of the widespread operation of the Company, it is very difficult to control the quality and quantity of line clearing work performed by each individual crew. In order to secure the best line clearance possible, and to assist the contractors and division superintendents in carrying out the Company’s policy, concise guidelines and standards had to be set forth to standardize the line clearing operation.
Guidelines
The first step taken by the Company to standardize the operation was to rewrite all line clearing agreements with the various contractors. One paragraph states, To perform the work in a workmanlike manner, according to standards provided by the Company .... This statement made it mandatory for guidelines to be written by the Company and followed by the contractors.
A Manual of Standard Line Clearing Practices was assembled from various sources. The Manual includes guidelines for tree removal, stump spraying, methods of tree trimming for line clearance, special requests for assistance from private contractors and property owners, overhanging limbs, line clearing during storms, general work procedure, and other operating problems.
Conclusions
Without an evaluation program and with line clearing crews and equipment contracted on an hourly basis, there is little incentive for contractors to correct undesirable conditions. A utility pays the same price for a crew that does not produce adequate line clearance as is paid for a good crew. The same statement can be made for equipment, new versus old. There appears to be very little competition between contractors to out-produce the next contractor. The only competition is to get more crews and equipment on the system than the next contractor. With an accurate audit, a uniform and fair crew evaluation that is also reliable and firm, and a Management that is dedicated to reliable electric service and also to improving the overall efficiency of the line clearing operations, the utility will see competition between contractors in both quality and quantity of work.
Even with an accurate work progress audit, there is no reliable measure of production. While the number of loads of debris, number of trees trimmed and removed, is not necessarily a measure of a crew’s production, it is an indication of production. As a direct result of the Company’s Line Clearing Crew Evaluation Program that attempts to include production as an important factor, we have reduced the number of men and equipment (any vehicle that requires a license to operate on public highways) required to trim the system from 61 men and 61 pieces of equipment in 1971 to 52 men and 46 pieces of equipment in 1975, a reduction of 9 men and 15 pieces of equipment. This reduction was made while continuing to improve the overall efficiency of the line clearing operations and, at the same time, continuing to provide our customers with high quality, reliable electric service.
In 1975, it is estimated the reduction in men and equipment will save the Company approximately $250,000. In 1969 and 1970, the annual line clearing budget was increasing about 17 percent each year. In 1971, Management started taking a very close look, via the evaluation, at the overall line clearing program. The evaluation, combined with a Management that did not hesitate to “rock the boat” for the best interest of the customers and stockholders, held the line clearing costs at about $900,000 in 1971, 1972 and 1973. The line clearing program was caught up in inflation in 1974. While holding the line on the line clearing budget for three years, the Company’s quality electric service to its customers was not reduced.
Dollars | Percent Increase (Decrease) over Previous Year | |
---|---|---|
1968 | $653,000 | |
1969 | 763,000 | 16.8 |
1970 | 897,000 | 17.5 |
1971 | 904,000 | .7 |
1972 | 896,000 | (.8) |
1973 | 892,000 | (.4) |
1974 | 965,000 | 8.1 |
1975 | 1,061,000 (Est.;) | 10.0 (Est.) |
Line Clearing Expenses 1968-1975 (Rounded off to the nearest $1,000)
Management’s firm decision to hold the line on inflation and plain good business practices (evaluation) has saved the Company about $1,000,000 since the inception of the program in 1971.
Appendix
APPENDIX
Weekly Tree Work Audit
Line Clearing Crew Evaluation Report (Unscheduled)
Line Clearing Crew Evaluation Report (Annual) Principal Considerations
Dependent Considerations
Line Clearing Proficiency Graph
Footnotes
↵1 presented at the International Shade Tree Conference in Detroit, Michigan in 1975.