Skip to main content

Main menu

  • Home
  • Content
    • Ahead of Print
    • Current Issue
    • Special Issues
    • All Issues
  • Contribute
    • Submit to AUF
    • Author Guidelines
    • Reviewer Guidelines
  • About
    • Overview
    • Editorial Board
    • Journal Metrics
    • International Society of Arboriculture
  • More
    • Contact
    • Feedback
  • Alerts

User menu

  • Register
  • Subscribe
  • My alerts
  • Log in

Search

  • Advanced search
Arboriculture & Urban Forestry
Arboriculture & Urban Forestry

Advanced Search

  • Home
  • Content
    • Ahead of Print
    • Current Issue
    • Special Issues
    • All Issues
  • Contribute
    • Submit to AUF
    • Author Guidelines
    • Reviewer Guidelines
  • About
    • Overview
    • Editorial Board
    • Journal Metrics
    • International Society of Arboriculture
  • More
    • Contact
    • Feedback
  • Alerts
  • Facebook
  • Twitter
  • YouTube
  • LinkedIn
Research ArticleArticles

Tree Replacement Program at Baltimore Gas and Electric Company

I.O. Bauer, T.D. Mayer and W.T. Rees
Arboriculture & Urban Forestry (AUF) February 1990, 16 (2) 42-44; DOI: https://doi.org/10.48044/joa.1990.16.2.42
I.O. Bauer Jr.
Baltimore Gas & Electric Company, 1116 Concordia Drive, Baltimore, Maryland 21204
  • Find this author on Google Scholar
  • Search for this author on this site
T.D. Mayer
Baltimore Gas & Electric Company, 1116 Concordia Drive, Baltimore, Maryland 21204
  • Find this author on Google Scholar
  • Search for this author on this site
W.T. Rees Jr.
Baltimore Gas & Electric Company, 1116 Concordia Drive, Baltimore, Maryland 21204
  • Find this author on Google Scholar
  • Search for this author on this site
  • Article
  • Figures & Data
  • Info & Metrics
  • References
  • PDF
Loading

Abstract

A wonderful opportunity for community improvement materialized as the “Greening of Dundalk”. A well coordinated effort between government agencies, private enterprise, university research and community volunteers resulted in a highly successful beautification program. The Baltimore Gas and Electric Company (BG&E) was able to participate by removing designated trees beneath the power lines and supplying flowering crab apples as replacements. The trees were obtained under the guidance of the Penn State sponsored Municipal Tree Restoration Program (MTRP) of which BG&E is an active member. BG&E expects to recoup it’s initial expenditures in approximately 3.3 years.

In many communities, street tree populations are taken for granted. Consequently, they are ignored and neglected. The benefits they were intended to provide may never be realized. When problems are recognized, however, all too frequently programs are set in motion only to grind to a halt through ineffective design or poor follow through. Sometimes funding is lacking or the political climate may change. A well-managed urban forest is not a part-time entity, but one that requires constant vigilance and care. The story we are about to tell is one of interested citizens amidst a decaying urban forest who seized the initiative for change. Through their efforts, governmental and corporate support was secured and an integrated approach to their problem was begun.

It all began on March 10,1988 when an article appeared in the Dundalk Eagle Newspaper delineating the history of the area’s trees. The article further commented on the poor condition of the current tree population and stated that community involvement could improve the situation. As a result, the Greater Dundalk Community Council contacted the Baltimore County Forest Conservancy District Board for advice on how to upgrade their trees. After several meetings, a decision was made to conduct a street tree inventory in the Historic Dundalk Area, with consideration for other parts of Dundalk at a later date. The purpose of this inventory would be to quantify the tree population and to document current management needs such as pruning, removals, plantings and insect control. Through word of mouth and an article that appeared in the Eagle asking for local support, 12 survey volunteers were recruited and trained in inventory techniques by the Maryland, Forest, Park, and Wildlife Service and the Baltimore County Forestry Board in April, 1988.

The survey lasted from May 28 until June 15. All data collected were collated and processed by the Maryland Forest, Park and Wildlife Service. From this information, a written report was developed as a management plan for the project. The results indicated that a large majority of the 1,147 trees in the area were sycamores, many of which were diseased or had outlived their growing space. About 1/3 of the total tree population was recommended for removal and replacement.

With this information in hand, the Greening of Dundalk Committee was formed by members of the Greater Dundalk Community Council and a decision was made to implement the report’s recommendations. The comprehensive plan was for the Greening Committee to coordinate the overall effort with assistance from the other agencies.

It was decided to conduct the initial operation in 3 phases within the Historic Dundalk Area. Phase 1, implemented in April of 1989, involved removal of approximately 130 trees and planting of 180. Phases 2 and 3, scheduled for 1990 and 1991, will involve similar numbers of trees. Prior to tree removal, it should be noted that all trees slated for removal were posted with signs printed by Patapsco High School students. The signs informed area residents of the program and of the impending cut downs. This action afforded adjacent homeowners an opportunity to refuse removal. Only one exercised the option.

Sixty of the trees to be removed were located under the power lines. This was done by BG&E contractor personnel. BG&E expects to recoup this expenditure in approximately 3.3 years (Table 1).

View this table:
  • View inline
  • View popup
Table 1.

Baltimore Gas and Electric Company Breakdown Analysis. Greening of Dundalk Project.

The remaining Phase I trees and all stumps were removed through a contract funded by the Baltimore County Department of Community Development. Additionally, Community Development funded the purchase of 110 trees comprised of a mixture of species. They also provided for County equipment and operators to dig the necessary holes and to provide logistical support to the area volunteers. For planting beneath the power lines, Baltimore Gas and Electric provided 70 tree-cultivars selected under the auspices of the Penn State-sponsored Municipal Tree Restoration Program. Under this program, selected cultivars are performance tested in actual field conditions. Extensive follow-up studies will be conducted and a data base developed for more accurate future siting of tested trees. In this instance, the trees were selected because of their low mature height and urban hardiness. The follow-up work in this study will be by Dundalk High School Science Department students, and will be conducted over a number of years.

Figure 1.
  • Download figure
  • Open in new tab
  • Download powerpoint
Figure 1.

Sycamore before removal.

Figures 2.
  • Download figure
  • Open in new tab
  • Download powerpoint
Figures 2.

Contractor removing trees.

Figure 3.
  • Download figure
  • Open in new tab
  • Download powerpoint
Figure 3.

Local community planting trees.

Figure 4.
  • Download figure
  • Open in new tab
  • Download powerpoint
Figure 4.

Panoramic view of newly-planted trees.

The actual planting went smoothly and was completed within a few days, thanks to the time and effort provided by the agencies and individuals involved.

Already, indications suggest that because of the grassroots community involvement, area residents are exhibiting heightened awareness and concern about the trees in their neighborhoods. Through their unflagging interest and hard work during all stages of this operation, they have accomplished much. Because of the same interest and hard work, they have convinced government and private enterprise alike that their community was worthy of attention and support. All parties involved stand to benefit from this experience for a variety of reasons. Enhanced aesthetics, reduced maintenance costs, and positive public relations are but a few.

Most importantly, through these efforts, the community has provided a successful model as a showcase for other communities. People can make a difference. Even as we speak, other communities in Baltimore County are already in the early stages of similar programs. The possibilities are limitless.

In recognition of the successful completion of Phase 1 of the Greening of Dundalk, and as a kickoff to Phases 2 and 3 and the dynamic process to follow, a commemorative ceremony was held honoring all involved. Government and corporate officials participated in acknowledgment of their efforts.

The BG&E Company goal of good electric reliability has been obtained and the Company has contributed to the community by providing desirable, low-growing, aesthetically pleasing trees in replacement for the sycamores.

For additional information about how you can help your community, contact any of the following organizations:

The Maryland Forest, Park and Wildlife Service Baltimore Gas and Electric Company

Baltimore County Forestry Conservancy District Board

Greening of Dundalk Committee

Municipal Tree Restoration Program, Penn State University

Footnotes

  • ↵1. Presented at the annual conference of the International Society of Arboriculture in St. Charles, Illinois in August 1989.

  • © 1990, International Society of Arboriculture. All rights reserved.
PreviousNext
Back to top

In this issue

Arboriculture & Urban Forestry (AUF)
Vol. 16, Issue 2
February 1990
  • Table of Contents
  • Index by author
Print
Download PDF
Email Article

Thank you for your interest in spreading the word on Arboriculture & Urban Forestry.

NOTE: We only request your email address so that the person you are recommending the page to knows that you wanted them to see it, and that it is not junk mail. We do not capture any email address.

Enter multiple addresses on separate lines or separate them with commas.
Tree Replacement Program at Baltimore Gas and Electric Company
(Your Name) has sent you a message from Arboriculture & Urban Forestry
(Your Name) thought you would like to see the Arboriculture & Urban Forestry web site.
Citation Tools
Tree Replacement Program at Baltimore Gas and Electric Company
I.O. Bauer, T.D. Mayer, W.T. Rees
Arboriculture & Urban Forestry (AUF) Feb 1990, 16 (2) 42-44; DOI: 10.48044/joa.1990.16.2.42

Citation Manager Formats

  • BibTeX
  • Bookends
  • EasyBib
  • EndNote (tagged)
  • EndNote 8 (xml)
  • Medlars
  • Mendeley
  • Papers
  • RefWorks Tagged
  • Ref Manager
  • RIS
  • Zotero
Share
Tree Replacement Program at Baltimore Gas and Electric Company
I.O. Bauer, T.D. Mayer, W.T. Rees
Arboriculture & Urban Forestry (AUF) Feb 1990, 16 (2) 42-44; DOI: 10.48044/joa.1990.16.2.42
del.icio.us logo Digg logo Reddit logo Twitter logo CiteULike logo Facebook logo Google logo Mendeley logo
  • Tweet Widget
  • Facebook Like
  • Google Plus One
Bookmark this article

Jump to section

  • Article
    • Abstract
    • Footnotes
  • Figures & Data
  • Info & Metrics
  • References
  • PDF

Related Articles

  • No related articles found.
  • Google Scholar

Cited By...

  • No citing articles found.
  • Google Scholar

More in this TOC Section

  • Hardscape of Soil Surface Surrounding Urban Trees Alters Stem Carbon Dioxide Efflux
  • Literature Review of Unmanned Aerial Systems and LIDAR with Application to Distribution Utility Vegetation Management
  • Borrowed Credentials and Surrogate Professional Societies: A Critical Analysis of the Urban Forestry Profession
Show more Articles

Similar Articles

© 2023 International Society of Arboriculture

Powered by HighWire